
- CGC1542451
- Florida GC license
- Pinellas
- County
- City or county
- City of Largo for addresses inside city limits, and Pinellas County for unincorporated Largo addresses
Last updated November 19, 2026
Who handles plumbing in Largo?
Inside Largo, Brothers Remodelers files plumbing with the City of Largo. Outside the limits, a Largo address is Pinellas County. The license is CGC1542451, and the workmanship warranty is two years. A tub that becomes a shower is drawn before the old tub comes out.
What the plumbing work includes
A tub-to-shower conversion is the Largo job we refuse to describe vaguely. If the drain and the valve stay, the work is a surround and a valve trim. If either moves, it is new piping, a new waterproofing limit, and an inspection. The proposal says which, with the opening sized.
The shower head height and the curb or the curbless entry are noted because they change the valve and the floor. They are not left for the tile setter to invent.
Adjacent lavatories are included only when you ask. A conversion does not automatically become a full bath remodel.
How the job runs
- 01
City or Pinellas County
We place the Largo address inside the city or outside it. Inside is the City of Largo. Outside is Pinellas County.
- 02
Mark the drain and the valve
Stay or move is written on both. Allowances cover the valve trim and the head if you have not chosen them. Demolition waits.
- 03
File the conversion that moves
Moved piping is filed with the City of Largo or Pinellas County under CGC1542451. A surround on an unmoved drain is the scope we often leave unfiled.
- 04
Inspect before the surround
The rough and the waterproofing stay visible for the required inspection. The two-year workmanship warranty follows the finished shower.
Permits and the local rules
The City of Largo permits addresses inside the city limits. Pinellas County permits unincorporated Largo addresses. Brothers Remodelers checks the line under CGC1542451 before the tub is demolished.
A shower that keeps the tub drain and the valve is a different filing from one that relocates either. We will not demolish first and discover the difference with the inspector.
Largo is in coastal Pinellas. The city or the county reads flood zone and wind exposure from the address when the permit needs them. We do not copy a Clearwater or St. Petersburg determination onto a Largo lot. Largo plumbing filed through December 30, 2026 is reviewed on the 8th Edition (2023), effective December 31, 2023. The 9th Edition starts December 31, 2026.
Largo sits between clearer municipal names, so the mailing address is especially easy to misread. The proposal repeats city or county in plain language.
Once that is settled, the conversion is a normal sequence: protect the room, open what the drawing opens, pass inspection, then build the surround. Largo's desk, city or county, does not change the order. It changes who is invited to the rough.
What affects the cost
Keeping the drain is cheaper than moving it, and keeping the valve is cheaper than opening a new wall. Those two choices dominate the price, ahead of the finish. No price list is offered here.
Tile and glass can be allowances. A rotten subfloor under the tub is not an allowance. It is priced when found. Workmanship warranty: two years.
Plumbing service details · Largo service area
Questions homeowners ask
City of Largo or Pinellas County?
Inside the city limits, the City of Largo. Outside them, Pinellas County. We confirm before demolition.
If the tub drain stays, is the shower still a permit?
Often the filing changes when the drain and the valve stay. If either moves, we file. The proposal states the fact for your address.
Do you decide the curb?
You do. Curbed or curbless is on the drawing because it changes the floor and the waterproofing.
Who is on site for inspection?
Brothers Remodelers. The rough stays open until the city or the county passes it.
What is the warranty?
Two years on workmanship. The valve and the finishes keep manufacturer warranties.
