
- CGC1542451
- Florida GC license
- Pinellas
- County
- City or county
- City of Largo for addresses inside city limits, and Pinellas County for unincorporated Largo addresses
Last updated November 19, 2026
Who handles driveways & pavers in Largo?
Driveway replacement in Largo removes the old surface, rebuilds a compacted base, and places concrete or pavers so water leaves the house. The apron is often public right of way. Inside city limits the City of Largo permits it. Outside them, Pinellas County does. We warrant the workmanship for two years under CGC1542451.
What the driveways & pavers work includes
Largo addresses fall on both sides of a city limit. The apron, often public right of way, is permitted by the City of Largo inside those limits and by Pinellas County outside them. We read the parcel before we tell you which signature the application needs. The word Largo on the mail is not the reading.
Whichever office it is, the drive is rebuilt the same way. Old surface removed. Base compacted. Concrete or pavers placed to slope water away from the house. Coastal exposure may add flood and wind to the review. Those items, when required, come from the address. They do not choose your finish.
You will see removal, base, surface, office, and warranty in one proposal. Brothers Remodelers holds CGC1542451. The workmanship warranty is two years. Digging at the street waits on the filing that matches the parcel.
How the job runs
- 01
Find the limit
We determine City of Largo versus unincorporated Pinellas County from the parcel. The proposal names that office for the apron.
- 02
Rebuild the section
The old surface is removed, the base is compacted, and the slope is set to move water away from the house.
- 03
Permit the apron
Because the apron is often public right of way, we file with the city or with Pinellas County before that concrete or those pavers come out.
- 04
Finish under warranty
The surface you chose is placed and the fall is checked with you. Workmanship is warranted for two years under CGC1542451.
Permits and the local rules
Inside the limits, the City of Largo permits the apron. Outside them, Pinellas County does. The apron is often public right of way, which is why a Largo driveway that reaches the street is usually a permitted job. The joint between private pavement and that edge is drawn, not guessed.
Largo is coastal. If the department requires flood or wind, both are read from the address. We do not invent a zone, and we do not invent a wind speed. The construction scope remains removal, a compacted base, concrete or pavers, and slope away from the house.
An application through December 30, 2026, city or county, is examined under the Florida Building Code, 8th Edition (2023), effective since December 31, 2023. The 9th Edition comes into effect on December 31, 2026.
Two neighboring drives can be a city apron and a county apron. Treating them as the same counter because both owners say Largo is how filings stall. We separate them at the visit. The water still has to leave each house.
Our Tampa office, 13542 N Florida Ave, is not a Pinellas permit counter, and Tampa's Accela and ePermitHub portals are not Largo's. CGC1542451 is the license. The review stays in the City of Largo or in Pinellas County.
What affects the cost
Area, material, removal, and the permitted apron make the price. The difference between a city file and a Pinellas County file is written down. It is not turned into a price per square foot.
The proposal includes that path and a two-year workmanship warranty. Bring us the address so the office is right before anyone discusses a number.
Driveways & Pavers service details · Largo service area
Questions homeowners ask
Who permits a Largo driveway apron?
The City of Largo takes an apron inside the limits. Pinellas County takes one outside them. The street connection is often public right of way, so we file with the office that actually owns the parcel.
How is water kept off the house?
The old surface is removed, the base is compacted, and concrete or pavers are sloped away from the house. We set that fall on purpose.
What if the property feels coastal?
Flood and wind are included when the department requires them, taken from the address. We do not write a zone or a wind speed into the proposal.
Which code edition covers 2026 filings?
The 8th Edition (2023), effective December 31, 2023, through December 30, 2026. Only when the calendar reaches December 31, 2026 is the 9th Edition effective.
What warranty is offered?
Brothers Remodelers warrants workmanship for two years under license CGC1542451.
