What a remodel costs depends on four things: how big the scope is, how much of the structure changes, the finishes you choose, and Florida-specific requirements such as wind code, flood zones and permits. Damage found during demolition can add to it. The most reliable way to know your number is a line-item proposal based on a visit to your home.
Last reviewed October 2026
The biggest cost drivers
Scope of work
A cosmetic refresh, a full gut renovation and an addition are very different projects. The more rooms, trades and square footage involved, the higher the cost.
Structural changes in block homes
Most Florida homes have concrete block walls on a concrete slab. Opening or removing a block wall usually needs an engineered beam or lintel, which adds engineering, materials and labor.
Plumbing through the slab
Moving a kitchen sink, a toilet or a shower usually means cutting and trenching the slab to reroute pipes, then patching it. Keeping fixtures where they are is one of the biggest ways to control cost.
Wind code and storm protection
Permitted work must meet the Florida Building Code's wind requirements. New windows and exterior doors in wind-borne debris regions need impact-rated products or approved storm protection, and additions need proper anchoring and roof tie-ins.
Flood zones
If your home is in a FEMA flood zone, a large remodel can trigger the 50% rule, which may require elevating the whole house. Check your flood zone before you set a budget.
Permits, engineering and inspections
Drawings, engineering, permit fees and inspections are part of a properly permitted job. They vary with the scope and with the building department.
Finishes and allowances
Cabinets, countertops, tile, fixtures and flooring range widely in price. Many proposals use allowances, a set amount for items you'll choose later. Your final cost depends on what you select.
Hidden damage
Rot, mold, termite damage and outdated wiring are often found only once walls are opened, especially behind older showers. A good contractor checks at demolition and prices any repair before work continues.
Lead times, access and approvals
Long-lead items such as windows and custom cabinetry affect the schedule. Condo and HOA rules, access to the site, and whether you live in the home during the work all affect cost too.
How to read a remodeling proposal
- Line items: each part of the work priced separately, so you can see where the money goes
- Allowances: set amounts for finishes you'll choose later. Check that they're realistic for what you want
- Exclusions: what isn't included, such as appliances, landscaping or permit fees
- Change orders: how changes are priced and approved. Ask for them in writing, before the work happens
- Payment schedule: payments tied to completed stages of work, not a large sum upfront
How to compare bids fairly
- 1.Make sure every bid covers the same scope.
- 2.Compare allowances line by line. A low bid with low allowances often ends up costing more.
- 3.Check that each contractor holds an active Florida license at myfloridalicense.com and carries insurance.
- 4.Ask who supervises the job day to day.
- 5.Ask how hidden damage and change orders are handled and priced.
How Brothers Remodelers prices a project
We visit your home, measure, and review the scope with you. Then we send a line-item proposal with allowances stated in plain language, so you can compare bids on equal terms. Change orders are priced in writing before the work happens. Financing is available through Upgrade and Ygrene, subject to credit approval. Terms vary.
FAQ
Why do remodeling quotes vary so much?
Quotes differ because the scope, allowances and exclusions differ. One bid may include engineering, permits and realistic finish allowances, while another leaves them out. Compare bids line by line, on the same scope, before comparing totals.
What is an allowance in a remodeling proposal?
An allowance is a set budget for an item you'll choose later, such as tile, fixtures or cabinets. If you choose something that costs more, the difference is added; if it costs less, you're credited. Check that the allowances match the finishes you want.
Does moving plumbing add a lot to the cost?
In most Florida homes, yes. Plumbing runs through the concrete slab, so moving a sink, toilet or shower usually means cutting and trenching the slab, then patching it. Keeping fixtures in place is one of the most effective ways to control cost.
Can hidden damage change the price after work starts?
It can. Rot, mold or termite damage is often found only when walls are opened. A good contractor checks for it at demolition and prices any repair in writing before continuing, so you approve the cost before it is added.
Do you offer financing?
Financing is available through Upgrade and Ygrene, subject to credit approval. Terms vary. Ask during your estimate.