Florida Certified General Contractor CGC1542451Serving Hillsborough, Pinellas, Pasco, Manatee & Sarasota
Mon – Sat, 7:00am – 6:00pmestimates@brothersremodelers.com
Home/Guides/Remodeling Permits

Remodeling Permits in Tampa Bay and Sarasota: City or County?

If your home is inside city limits, your remodeling permit comes from that city's building department. If it's in an unincorporated area, the county issues it. Your mailing address won't tell you which: many homes with a Tampa, Sarasota or Bradenton mailing address are actually in unincorporated county. Your county property appraiser's record is the surest check.

Last reviewed October 2026

Which remodels need a permit

A permit is generally needed when the work involves:

  • Structural changes, such as removing or opening a wall, or adding a beam
  • Electrical work, such as new circuits or a panel change
  • Plumbing work, such as moving a sink, toilet or shower
  • HVAC or other mechanical work
  • Windows, exterior doors and roofing
  • Additions and any new square footage

Work that often doesn't need a permit includes painting, most flooring, and replacing cabinets or countertops without moving plumbing or electrical. Rules vary by city and county, so check before you start.

How to tell if your home is inside city limits

  1. 1.Go to your county property appraiser's website and search for your address.
  2. 2.Open the parcel record and look for the jurisdiction, municipality or taxing district.
  3. 3.If it names a city, that city issues your permit. If it says unincorporated, the county does.
  4. 4.If you're still not sure, call the city's building department with your address.

City or county, by area

CountyIncorporated cities (start with the city)Common unincorporated communities (county permits)
HillsboroughTampa, Temple Terrace, Plant CityBrandon, Riverview, Lutz, Odessa, Westchase, Carrollwood, Town 'n' Country, Citrus Park, Seffner, Valrico, FishHawk, Apollo Beach, Ruskin, Sun City Center, Gibsonton, Wimauma
PinellasSt. Petersburg, Clearwater, Largo, Pinellas Park, Dunedin, Tarpon Springs, Safety Harbor, Seminole, Oldsmar, Gulfport and the beach citiesPalm Harbor, East Lake, Tierra Verde, Lealman
PascoNew Port Richey, Port Richey, Zephyrhills, Dade CityWesley Chapel, Land O' Lakes, Trinity, Holiday, Hudson
SarasotaSarasota, Venice, North Port, Longboat KeySiesta Key, Osprey, Nokomis, Fruitville, Bee Ridge, Laurel, the Sarasota County part of Englewood
ManateeBradenton, Palmetto, Holmes Beach, Anna Maria, Bradenton BeachLakewood Ranch, Parrish, Ellenton, Myakka City, Cortez

Some smaller cities contract their building services to the county, so start with the city and it will point you to the right office. A few communities cross county lines: Lakewood Ranch spans Manatee and Sarasota counties, Longboat Key spans both and issues its own permits, and Englewood extends into Charlotte County.

The Notice of Commencement

For many permitted jobs, Florida law requires a Notice of Commencement to be recorded with the county clerk and posted at the job site before work begins. It protects you by putting the job on public record. Your contractor should prepare it and tell you when to sign it, because the property owner signs it.

What affects how long a permit takes

  • How complex the plans are, and whether engineering is needed
  • Flood zone review, if your home is in a Special Flood Hazard Area
  • Product approvals for windows and exterior doors under Florida's wind requirements
  • How busy the building department is
  • Corrections the reviewer asks for

Every department sets its own review and inspection schedule. That affects your start date more than most homeowners expect.

HOA and condo approvals are separate

Many Tampa Bay and Sarasota neighborhoods and condo associations require their own approval before exterior work, additions or structural changes. That approval doesn't replace a building permit, and a permit doesn't replace it. Plan for both.

How Brothers Remodelers handles permits

We confirm which building department covers your address, prepare the drawings and filings, and handle the permit application under our Florida general contractor license, CGC1542451. We also schedule inspections and walk you through the Notice of Commencement. You'll know which department is involved before your estimate is final.

If your home is in a flood zone, read our guide to the FEMA 50% rule.

FAQ

Do I need a permit to remodel a kitchen or bathroom?

Usually, yes. A permit is generally required when the remodel moves plumbing, adds electrical circuits, changes walls or involves mechanical work. Replacing cabinets or countertops in place may not need one. Rules vary by city and county, so confirm with your building department.

My address says Tampa. Does the City of Tampa issue my permit?

Not necessarily. Many homes with a Tampa mailing address are in unincorporated Hillsborough County, including much of Brandon, Riverview, Carrollwood and Town 'n' Country. Check your parcel on the Hillsborough County Property Appraiser's website to see which jurisdiction you're in.

Who pulls the permit, me or the contractor?

When you hire a licensed contractor, the contractor normally applies for the permit under their license and is responsible for the inspections. As the property owner, you sign documents such as the Notice of Commencement.

What happens if work is done without a permit?

Unpermitted work can cause problems when you sell or insure the home, and you may be required to open up finished work for inspection or remove it. Permitting at the start costs less than fixing it later.

How long does a remodeling permit take?

It depends on the department, the scope of work, and whether engineering or flood review is involved. Simple permits move faster than additions or structural work. Your contractor should give you an expected timeline once the plans are ready.

Not sure which department covers your home?

Send us your address and project scope. We'll confirm who issues your permit and what it will involve.

Request a Free Quote
CallGet a Quote