Who handles solar in Tampa?
A Tampa solar project starts with the roof that is already there. Brothers Remodelers does not replace roofs. If that roof cannot carry the array, we say so before the job is scheduled. When it can, the layout, the electrical path, the building permit, and the utility interconnection are one scope under CGC1542451.
What the solar work includes
Layout is drawn on the planes you have, with shade from the house itself noted, not from a hopeful aerial. Modules are grouped where the structure and the fire setbacks can both live. A pretty full roof that blocks a required path is not the layout we propose.
The electrical path is the inverter or its equivalent, the disconnects, and the landing in the existing service. If the service cannot accept that landing, the limit is stated before equipment is ordered. A licensed electrician builds that path. The building permit covers the array on the roof.
Interconnection is the utility's process for the address, not a form we invent. We do not schedule an install on a roof we have already judged unfit. The two-year workmanship warranty covers the installation. Module warranties stay with the maker. The office is 13542 N Florida Ave.
How the job runs
- 01
Judge the roof first
Age, structure, and the planes that could hold modules are reviewed. If the roof cannot carry the array, that is the finding, and the project is not scheduled. We do not replace the roof.
- 02
Draw the array and the path
You see the layout and the electrical route in one proposal. Service limits are written. Nothing is ordered from a satellite image alone.
- 03
Permit the parcel
Incorporated Tampa is filed with the City of Tampa Construction Services Center through Accela at aca.tampagov.net and ePermitHub. Carrollwood, Town 'n' Country, Westchase, and Lake Magdalene are Hillsborough County.
- 04
Interconnect, then install
The utility application and the building permit are both in motion before modules are treated as permanent. Inspection and the two-year workmanship warranty close the work.
Permits and the local rules
A solar array needs a building permit. The electrical path needs its inspection too. Brothers Remodelers files under CGC1542451. Incorporated addresses use City of Tampa Construction Services, Accela and ePermitHub. We do not start as if interconnection were optional paperwork after the fact.
Carrollwood, Town 'n' Country, Westchase, and Lake Magdalene are not city Accela jobs, even when the mail says Tampa. Those roofs are Hillsborough County permits. The parcel is checked before a layout is promised to a reviewer.
Flood and wind are read from the address by the building department when they apply. We publish no zone and no speed. Solar sets accepted through December 30, 2026 are reviewed on the 8th Edition (2023), effective December 31, 2023. The 9th Edition is effective December 31, 2026.
Tampa is incorporated, coastal, and in Hillsborough County. Coastal exposure is a reason to specify attachments and flashings that suit the roof we found, not a reason to claim every plane in the city is the same. If the roof is the wrong roof, we say so before scheduling.
The utility that serves the house is the utility on the interconnection. We do not guess a second company for convenience. Workmanship on the array and the electrical path we install is warranted for two years.
What affects the cost
There is no price on this page. The proposal, after the roof is seen, reflects the layout, the electrical path, and whether the service can take it. A roof that cannot carry the array stops the number. We will not price modules for a roof we would have to decline.
Permit fees are the city's or the county's, named. Utility interconnection is not given a fake allowance. If the service must change before an array is honest, that limit is a line, not a surprise on install morning.
Solar service details · Tampa service area
Questions homeowners ask
Will Brothers replace my roof and then add solar?
No. Brothers Remodelers does not replace roofs. If the existing roof cannot carry the array, we say so before scheduling. The solar scope starts only on a roof that can.
Which Tampa desk gets the solar permit?
City of Tampa Construction Services, Accela and ePermitHub, for incorporated lots. Carrollwood, Town 'n' Country, Westchase, and Lake Magdalene are Hillsborough County.
What is the electrical path?
The route from the array to the inverter, the disconnects, and the service. A licensed electrician builds it. If the panel cannot accept the connection, we say that before equipment is ordered.
Do you handle utility interconnection?
Yes. Interconnection with the utility that serves the address is part of the scope, along with the building permit. It is not left as your errand after the modules are up.
What is warranted?
Two years of workmanship from Brothers Remodelers, license CGC1542451. The module and inverter makers warrant their equipment.