
Bathroom Remodeling in Clearwater, FL
Bathroom Remodeling in Clearwater, Pinellas County. License CGC1542451.
- CGC1542451
- Florida GC license
- Pinellas
- County
- City of Clearwater
- City of Clearwater
Last updated November 19, 2026
Who handles bathroom remodeling in Clearwater?
Clearwater bathrooms are City of Clearwater permits. Brothers Remodelers holds CGC1542451 and warrants workmanship for two years. The city is incorporated, in Pinellas County, and coastal. We set the shower or tub, the vanity, and the fan on a drawing before tile is chosen, and the waterproofing is inspected before that tile when the permit requires it.
What the bathroom remodeling work includes
The vanity is often the part people pick first, and it is the part we draw second. First is the shower or the tub: does the fixture stay, and does the valve stay reachable from the front once the new wall is closed. A valve buried behind tile, with no access, is a callback waiting. We draw the access with the waterproofing.
Tile comes after that drawing, as a material you may already know or as an allowance. The membrane underneath is specified either way. It runs across the wet walls and the pan or the tub deck, and it is the surface the inspector sees if the permit asks for that look before tile. Grout is not the waterproofing.
Ventilation and the electrical that serves the vanity lights are listed with the fixtures. A fan ducted into the room, or a fan with no duct at all, is replaced with a path that leaves the room. Moving the toilet to steal a few inches for a longer vanity is a fixture move, and it is permitted with the City of Clearwater.
How the job runs
- 01
Draw the valve and the drain
We measure the shower or tub and the vanity drain. You decide what stays. The valve is shown where it can be serviced, and the waterproofing outline is drawn around the wet area.
- 02
Allow the finishes
Tile, the vanity, the top, and the faucet can be allowances. The fan and its route are specified. You approve the sheet before the old surround comes out.
- 03
Submit to Clearwater
The City of Clearwater is the reviewer for a bathroom inside this incorporated city. A filing goes in when a wall opens or a fixture moves. A pipes-and-walls refresh usually is not filed.
- 04
Tile after the membrane
Plumbing rough-in and the waterproofing inspection, when required, come before tile. The vanity and the fixtures are trimmed after the tile. CGC1542451 and the two-year workmanship warranty are the closeout.
Permits and the local rules
Clearwater is an incorporated city in Pinellas County, and a bathroom inside the city is a City of Clearwater permit. Brothers Remodelers files under CGC1542451. Drawings are prepared at 13542 N Florida Ave in Tampa. The city is who inspects.
The permit triggers are an opened wall and a moved fixture. A longer vanity that pushes the toilet over is a moved fixture. New hardware and a new mirror, on untouched pipes, usually are not a permit. We name the trigger in the proposal so the filing matches the room.
Because the city is coastal, the building department reads flood zone and wind exposure from the address when the bathroom requires it. We do not fill those values in from memory. Clearwater bathroom permits filed through December 30, 2026 follow the 8th Edition (2023) of the Florida Building Code, the rule since December 31, 2023, and a filing that starts on December 31, 2026 is a 9th Edition review.
Clearwater is incorporated Pinellas, and it is coastal. Bathrooms across the city use the same building department. They take their flood and wind reading from the address when an opening or the map makes that reading necessary.
What the room needs is practical: a shower or tub you can maintain, a vanity that fits the measured wall, and a fan that actually exhausts. The city permit is how the waterproofing gets seen before the tile covers it.
What affects the cost
A fixture that stays is the smaller plumbing number. A toilet or a shower that moves is the larger one. Tile quantity, glass, and the vanity you select sit on top. A new fan circuit is its own line when the existing fan cannot be reused.
Allowances cover finishes still open, so you can sign the layout before the tile is final. The membrane specification does not wait. Repairs found when the wall is open are priced before waterproofing, and before tile.
Bathroom Remodeling service details · Clearwater service area
Questions homeowners ask
Is a Clearwater bathroom a city permit?
Yes, inside the city. Clearwater is incorporated and in Pinellas County. Brothers Remodelers files with the City of Clearwater under CGC1542451 when the scope needs a permit.
Why is the valve location on the drawing?
So it can be reached after the tile is on. A valve with a service path is part of the waterproofing plan. Burying it and hoping is how a small repair becomes a new surround.
Do you tile before the waterproofing inspection?
No, when the permit requires the inspection. The membrane is reviewed first. Tile starts after that. If the scope needs no permit, we still photograph the waterproofing before it is covered.
Can the vanity top be chosen later?
Yes. It can be an allowance, along with the faucet and the tile. The drain location is decided now, because that decision is the plumbing.
Which code edition is Clearwater using for bathrooms?
Filings through December 30, 2026 follow the 8th Edition (2023), in place since December 31, 2023. A filing dated December 31, 2026 is reviewed under the 9th Edition.
